Security
Industrial-grade security for OT/IT environments
Sortation control systems sit at the OT/IT boundary. Sortwyre is designed to connect without introducing new OT attack surface.
OT/IT boundary
How Sortwyre handles the OT/IT boundary
Sortation control systems — PLCs, WES controllers, SCADA — operate in the OT zone where network access must be strictly controlled. Sortwyre is designed for this environment.
Security design
Security principles
Data scope
Sortwyre ingests sort event telemetry only — no PII, no carrier account credentials, no parcel-level manifests. Data collected: scan events, PPH metrics, chute status, WES device state.
Read-only OT tap
Sortwyre's OPC UA and MQTT connections are subscribe/read-only. No write commands are issued to any PLC, WES controller, or conveyor control system. The sorter control plane is not modified.
Network deployment
Deployed as an on-premises agent or private-cloud connector. No public inbound ports to your OT network. The Sortwyre agent initiates all outbound connections — no inbound connectivity required from the internet to your OT segment.
IEC 62443 design approach
Sortwyre is designed with IEC 62443 industrial security principles in mind — zone-and-conduit network segmentation, least-privilege access, and read-only industrial protocol use. We do not claim IEC 62443 certification; we design for alignment with its principles.
SOC 2 roadmap
Sortwyre has a SOC 2 audit on its roadmap. We are building with SOC 2 controls in mind from the ground up — access logging, data handling policies, change management, and incident response procedures. SOC 2 Type II audit is planned as the platform scales.
Encryption in transit
All data transmitted from the Sortwyre on-prem agent to the analytics layer is encrypted in transit using TLS 1.2+. OPC UA connections use its built-in security mode (SignAndEncrypt where supported by the WES server).
Security questions from your IT/OT team?
We work directly with your network and security teams during pilot scoping. Contact us to set up a security review call before the integration kickoff.
Run a throughput pilot in your FC
Connect Sortwyre to your WMS or WES in under 6 weeks. No hardware installation, no conveyor downtime.